
Westfield London
URBANREVIVO — Westfield London
Overview
Full retail fit-out enabling works for URBANREVIVO at Westfield London — delivered live alongside trading hours over 14 weeks. Strip-out, escalator removal, concrete infill, structural steel and fire stopping across a 3,000 m² unit.
Scope of works
- Removal of shop front
- Full strip-out
- Screed removal
- Escalator removal
- Concrete infill
- Steel beams
- Fire stopping
On site
Gallery
Inside the project.









