Westfield London

URBANREVIVO — Westfield London

Overview

Full retail fit-out enabling works for URBANREVIVO at Westfield London — delivered live alongside trading hours over 14 weeks. Strip-out, escalator removal, concrete infill, structural steel and fire stopping across a 3,000 m² unit.

Scope of works

  • Removal of shop front
  • Full strip-out
  • Screed removal
  • Escalator removal
  • Concrete infill
  • Steel beams
  • Fire stopping